Inspection and handover/Global · UAE
Smoke pencil, smoke machine or peppermint test: what each one finds
What a smoke pencil, a drain smoke machine and a peppermint test can and cannot show, how each is done, and why smoke near a detector in a UAE tower needs FM first.
These three tests answer different questions. A smoke pencil puffs a little white vapour so you can see which way air moves at a crack, a grille or a gap around a pipe. A smoke machine pushes smoke into the drain pipes under slight pressure, and the smoke comes out wherever the system leaks. A peppermint test sends a strong smell down the drains and you hunt for it with your nose. Only the smoke machine points to an exact leak in a drain.
Most people come to these tests because of a smell. Start with the simple checks in sewer smell in an apartment: a dry trap or a gurgling basin explains most cases, and no smoke is needed. The tests below are for when those checks come up empty.
In a UAE apartment tower, smoke near a ceiling detector can set off the building's fire alarm. Only the building's facilities management (FM) can isolate detectors. Ask them before any smoke machine test, and before you use even a smoke pencil near the ceiling or in a small room with a detector.
#Which test answers which question
| Smoke pencil | Smoke machine | Peppermint test | |
|---|---|---|---|
| Shows | Which way air moves at one spot | Where drain pipes and seals leak | Roughly where drain air gets out |
| How | Short puff of glycol vapour | Smoke pumped into drains, vents sealed, slight pressure | Peppermint oil and hot water down the stack |
| Who | You | Plumber, arranged with FM | Two people, one stays outside |
| Good for | Extract fan pull, air from a boxing or shaft, drafts | Hidden leaks behind boxing, bad seals, pipes left open after works | A quick check when no machine is available |
| Limits | Pushes nothing into the pipes | Traps must be full, vents sealed, building agrees | Vague; smell spreads through the flat |
#Smoke pencil: seeing which way air moves
A smoke pencil is a small hand tool that heats a liquid into white vapour. Gastec's Smoke Tube Set No. 550, for example, heats propylene glycol and vegetable glycerin. One cartridge gives about 500 one-second puffs. Gastec says not to run it for more than 30 seconds at a time and not to breathe the smoke in.
How to use it:
- Make the air move one way. Close the windows and the bathroom door, and switch on the bathroom extract fan. The fan pulls air out of the room, so air flows in through every gap.
- Puff once, close to the gap. Hold the tip a few centimetres from the joint and give it one short puff. Work low down, away from the ceiling detector; if the gap you need is up by the ceiling, ask FM first.
- Watch the smoke. Pulled into the gap means air is going in. Blown away from it means air is coming out.
What it is good for in a flat:
- Is the extract fan working? Smoke at the grille should be sucked in straight away.
- Is the smell coming out of a shaft? Try the gaps around pipes in a boxing, around an access panel, behind the WC and under the bath panel. If air comes out of a gap while the fan runs and the smell is strongest there, drain air is getting into the boxing or shaft behind it.
- Drafts at windows, doors and around a fan coil grille.
What it cannot do: find a leaking joint inside a wall. The smell can travel along a boxing and come out somewhere else. The pencil only tells you where air moves at the gap you are holding it to.
#Smoke machine: finding the leak in the drains
A drain smoke machine makes a lot of thick smoke and blows it into the drainage pipes. The US residential code describes the classic method:
- All traps are filled with water.
- Smoke is pumped into the system.
- When smoke appears at the vent pipes on the roof, they are sealed.
- A pressure of an inch of water (249 Pa) is held for at least 15 minutes.
Any leak shows as a plume of smoke: an open pipe end left under a kitchen unit, a WC pan connector that no longer seals, a cracked pipe behind a boxing, a joint in a shower drain.
In an apartment block your drains join a shared stack. Smoke pushed into your branch can reach the stack and come out of any dry trap in the building, including your neighbours'. A careful contractor plugs your branch off from the stack, or the whole test is arranged with FM.
Plastic pipes. England's drainage guidance tests drains with air: 38 mm of water for 3 minutes, with every trap keeping at least 25 mm of water. It lists smoke testing as a way to find the fault after a water test has failed, and says smoke testing is not recommended for PVC-U pipes. The Dubai Building Code makes all drain pipes inside buildings PVC-U. So before a smoke test in a Dubai tower, ask the contractor what method they use on PVC-U and whether an air test of your branch would answer the question.
#Peppermint test
The old US method: pour 2 ounces (59 mL) of peppermint oil into the system, follow it with 10 quarts (about 9.5 litres) of hot water and seal the roof vents. If anyone can smell peppermint at a trap or anywhere else, the system leaks there.
Massachusetts still allows it, but only for concealed pipes in existing buildings. Whoever handled the oil must stay out of the building until the test is over, because the smell on their hands and clothes spoils the result. A 2021 proposal to the International Code Council called the test archaic and ineffective, and noted that the International Plumbing Code never had it and the Uniform Plumbing Code dropped it in the 1980s.
In a flat you cannot reach the roof vent, so a home peppermint test means pouring the mix into one of your own drains. It can tell you that drain air reaches a certain room. It will not tell you which joint leaks.
#What goes wrong
- Smoke near a detector without telling FM. The alarm goes off, the building may be evacuated, and you may be fined (see In the UAE).
- Covering a detector without telling FM. The detector is part of the building's fire system. Emaar's rules do want detectors in a flat protected during works, but the cover goes on with FM's knowledge and comes off when the work ends. A forgotten cover leaves the flat unprotected.
- Smoke test with dry traps. Smoke pours out of every unused basin and floor drain and you learn nothing. Fill all traps first.
- Vents left open. Without sealed vents there is no pressure and small leaks stay hidden.
- Smoking a shared stack without warning anyone. Smoke comes out in other flats.
- The person who poured the peppermint does the sniffing.
- Reading a smoke pencil as a leak detector. It shows air movement at one gap, not where the pipe is broken.
- Incense, matches or a lighter instead of a smoke pencil. An open flame in a room you are testing for drain gases, near a detector, is a bad idea twice over.
#How to check the work
When a contractor smoke-tests your drains:
- FM approved the test and the date.
- FM isolated the detectors in the right zone, and confirmed afterwards that they are back on.
- All traps were filled before the smoke went in.
- Vents were sealed, or your branch was plugged off from the stack.
- The pressure and how long it was held were shown to you.
- You have photos or a video of every plume, with its location.
- Each fault was fixed and the test repeated.
#When to call a professional
- Smoke machine test: a plumber. In a tower, through FM, because the stack, roof vents and fire alarm are the building's.
- Detector isolation: FM only. Not your contractor, not you.
- Smell in several rooms, or neighbours smell it too: FM. The problem is likely in the stack or its vents. See sewer smell in an apartment.
- Smell from the air conditioning: FM or an AC technician. See AC drain problems.
If the smoke test points to a joint inside a finished wall, the repair becomes a small renovation. Draw the wall in Librae and it works out how many square metres of tile have to come off. In the UAE, a repair like this ordered through Librae can come with independent quality control, so the drain joints are checked before they are closed up again.
#In the UAE
The alarm may go further than the building. The Ministry of Interior's Hassantuk system links commercial buildings, facilities and private homes to a central alarm receiving centre. Its page says the signal arrives within seconds, is checked, and Civil Defence centres are told to send help. It does not say which residential towers are connected, so ask FM whether yours is and what happens when a detector in a flat goes off.
Building rules. Emaar's rules for Downtown Dubai towers forbid anything that interferes with fire safety devices or sets off a false alarm and causes an evacuation. Fire alarm devices in a unit must be protected during works. In the communities run by Dubai Holding Community Management, negligence that sets off fire alarms gets a warning first, then a fine of 1,000 dirhams, then double that. Your own building may have different rules; FM has them.
How isolation works in practice. The detectors in your flat are wired to the building's fire alarm panel, and FM controls the panel. We found no residential developer document that spells out the request step by step, so ask FM for their procedure. The office fit-out manual of Central Park Towers in DIFC shows the usual pattern: the tenant asks the building to isolate smoke alarms before work that makes smoke or dust, and someone keeps a fire watch while they are off. Give FM the date, the time and the rooms. Do the test. Then ask them to confirm the detectors are back on.
Drains in towers. The stack, the vents on the roof and the shafts are common parts, so a smoke test of anything beyond your own branch is FM's job.
#What the codes say
- US International Residential Code 2021, P2503.5.2: smoke test at 1 inch water column (249 Pa) for at least 15 minutes with traps filled; peppermint test with 2 oz (59 mL) of oil and 10 quarts of hot water.
- Massachusetts 248 CMR 10.04(2)(a)1.d–e: peppermint test only for concealed piping in existing buildings; the person who handled the oil stays out.
- Approved Document H (England) 2015, paragraphs 1.3 and 1.38: 25 mm minimum trap seal under test, 38 mm water gauge air test for 3 minutes, smoke testing not recommended for PVC-U.
- Dubai Building Code 2021, H.6.2.8: internal sanitation pipework is PVC-U.
- Emaar Downtown vertical community rules (2026), 4.5 (xii, xiv) and 9.7 (iv, vi); DHCM community rules (October 2026), chapter 13, non-compliance table.
- Central Park Towers Office Fitout Manual (2023), 4.12: isolation of smoke alarms on request for works that make smoke or dust (office tower, used as an example only).
This guide explains good practice and cites the documents listed below. It is not a permit, a design approval or an engineering opinion. Work on electrical, gas, fire-safety and structural elements must be carried out by licensed professionals and approved by the relevant authority.
Sources
- Gastec, Smoke Tube Set No. 550, instruction manual (IM97550E2) — Smoke made by heating propylene glycol and vegetable glycerin; do not inhale; about 500 one-second puffs per cartridge; no more than 30 seconds of continuous use.
- International Residential Code 2021, P2503.5.2 Finished plumbing (text quoted in ICC 2021 Group A committee action hearings, proposal RP1-21) — Smoke test with traps filled, vent terminals sealed once smoke appears, 1 inch water column (249 Pa) for at least 15 minutes; peppermint test with 2 oz (59 mL) of oil and 10 quarts of hot water. The same document carries a proposal calling the peppermint test archaic.
- Massachusetts 248 CMR 10.04(2)(a)1.d–e, testing of drainage systems — Peppermint test only for concealed piping in existing buildings; whoever handled the oil stays out of the building until the test ends; smoke test leaks shown by plumes of smoke.
- Approved Document H (England), 2015 edition, H1 paragraphs 1.3 and 1.38 — Traps keep at least 25 mm of water under working and test conditions; air test of 38 mm water gauge for 3 minutes; smoke testing to find defects after a failed water test, not recommended for PVC-U.
- Dubai Building Code 2021, Part H, H.6.2.8 Sanitation pipework (p. 612) — All internal sanitation pipework PVC-U.
- Hassantuk service page, UAE Ministry of Interior, General Command of Civil Defence (read 1 November 2026) — Links commercial buildings, facilities and private homes to a central alarm receiving centre; the signal arrives within seconds, is verified, and operations rooms and Civil Defence centres are told to send help.
- Emaar Community Management, Community Rules and Regulations for Vertical Communities, Downtown Dubai (January 2026), 4.5 (xii, xiv) and 9.7 (iv, vi) — Residents must not interfere with fire safety devices or trigger a false fire alarm that causes an evacuation; fire alarm devices in a unit must be protected during works to prevent accidental triggering; changes to life safety systems need authority approvals.
- Dubai Holding Community Management, Community Rules and Regulations (1 October 2026, v3), chapter 13 Non-compliance — Non-compliance table (p. 87) - cooking smoke, tampering with fire safety devices or negligence that sets off fire alarms, classed as an illegal practice, penalty 1,000 dirhams - warning first, then the fine, then double the fine; penalties apply only as far as the law and DLD/RERA-approved schedules allow.
- Central Park Towers (Dubai), Office Fitout Manual 2023, section 4.12 Temporary fire protection (p. 29) — Office tower, not residential - where works make smoke or dust, the tenant asks the fit-out manager to isolate the smoke alarms; fire watch during isolation. Used only as an example of how isolation is requested; no residential developer document describing the procedure was found.