Topics/6 guides
Tiles and wall finishes
Flexible stone, large slabs, grout, tile layout, microcement, limewash and paint.
Global guides6
- Tiles and wall finishesGlobalFlexible stone and MCM soft tile: what you are buying, how to fit itReal stone veneer sheets, MCM "flexible travertine" and plastic imitations compared, plus surfaces, adhesives, corners and curves, showers and outdoor use.
- Tiles and wall finishesGlobalUAETile grout: cement, epoxy or urethane, and where each one worksWhat CG1, CG2WA and RG on the bag mean, which grout to use in showers, kitchens and living floors, joint widths, sealing, cure times and regrouting.
- Inspection and handoverGlobalUAEChecking finished tiling: hollow tiles, lippage, flatness and groutHow to accept a tiling job yourself — tapping for hollows, steps between tiles, flatness under a 2 m straightedge, joints, grout and sealant, with UK and US limits.
- FloorsGlobalUAELarge-format porcelain floor tiles: base, adhesive, clips and jointsHow 60×120 and 120×120 porcelain goes down on a floor without hollows or lips — base flatness, adhesive class, back-buttering, levelling clips and joints.
- Bathrooms and wet areasGlobalUAEMould in the bathroom and behind furniture: causes and removalWhy mould grows on bathroom ceilings, round AC grilles and behind wardrobes, how to clean it safely, and how to stop it returning in an air-conditioned home.
- Tiles and wall finishesGlobalUAEPainting walls: preparation, primer, coats and humid climatesThe right order for painting walls, which primer, how many coats, drying times, how much paint to buy, and what heat, humidity and AC change in the UAE.
Librae
Plan your renovation before you talk to contractors
Librae turns a floor plan into a 2D and 3D project with quantities and an estimate. Every contractor in the directory is checked by Librae.