Topics/12 guides
Inspection and handover
Smoke tests, leak detection, snag lists, handover checks and fire alarm issues.
Global guides6
- Bathrooms and wet areasGlobalBathroom waterproofing under tiles, and how to flood test itWhich membrane to use, how high to take it, how to seal corners, pipes and the drain, how thick and how long to cure, and how to run a 24-hour flood test.
- Inspection and handoverGlobalUAESmoke pencil, smoke machine or peppermint test: what each one findsWhat a smoke pencil, a drain smoke machine and a peppermint test can and cannot show, how each is done, and why smoke near a detector in a UAE tower needs FM first.
- Plumbing and water heatingGlobalHow to pressure test water pipes: PEX, PPR, multilayer and copperTest pressures, hold times and pass limits for copper and plastic water pipes, why the gauge drops on plastic, water or air, and what goes in the test record.
- Inspection and handoverGlobalUAEAccepting a renovation: snag list room by roomHow to inspect a finished renovation, write snags a contractor cannot argue with, and hold back payment until they are fixed, with notes for UAE flats.
- Electrical and lightingGlobalUAEElectrical testing after a renovation: tests, numbers, certificateWhich tests an electrician runs on new wiring, what results are acceptable, which certificate you should receive and how to read it, and how it works in Dubai.
- Inspection and handoverGlobalUAEChecking finished tiling: hollow tiles, lippage, flatness and groutHow to accept a tiling job yourself — tapping for hollows, steps between tiles, flatness under a 2 m straightedge, joints, grout and sealant, with UK and US limits.
UAE6
- Inspection and handoverUAENew apartment handover in the UAE: snagging and defects liabilityWhat to check before you take the keys from a UAE developer, how to record snags, and how long the developer must fix defects under Dubai and UAE law.
- Inspection and handoverUAEIndependent quality control during a renovation in the UAEWhat independent site supervision is, what it checks at each stage before walls and floors are closed, how it ties to stage payments, and what it costs via Librae.
- Planning and layoutUAERenovating a new off-plan flat after handover: what to do firstWhat to change in a new UAE apartment before you move in, in what order, and how to renovate without losing the developer's 1-year warranty on installations.
- Permits, contracts and moneyUAEDeveloper defects liability in the UAE: the 1-year and 10-year rulesWhat a UAE developer must still fix after handover, for how long, how to report a defect so it counts, where to escalate in Dubai, and how a renovation can affect it.
- Permits, contracts and moneyUAEDispute with a renovation contractor in the UAE: where to goWhat to do when a fit-out contractor leaves defects, stops work or asks for more money, and which body in Dubai actually hears the dispute, step by step.
- Inspection and handoverUAEFalse fire alarms during renovation in UAE towers: how to avoid themWhy renovation dust sets off the building fire alarm, how FM isolates detectors, what dust covers can and cannot do, who pays the fine, and what to check when works end.