Topics/6 guides
Floors
Screeds, substrate checks, SPC, engineered wood, large-format porcelain and microcement.
Global guides6
- FloorsGlobalUAESPC and LVT vinyl floors: click or glue-down?Click rigid-core (SPC) or glue-down LVT? What the base must be like, laying over old tiles, gaps at walls and doors, and sun through big windows.
- Bathrooms and wet areasGlobalUAEWalk-in shower without a tray: drain, falls and floor heightPoint drain or linear drain, how much fall a tiled shower floor needs, how high the floor build-up gets, and what UAE buildings allow when you move a drain.
- FloorsGlobalUAEEngineered wood floors in a hot, humid climateHow to keep an engineered wood floor flat in a hot, humid place — room humidity, acclimatising, the base, floating or glued, and the gap at the walls.
- Tiles and wall finishesGlobalUAETile grout: cement, epoxy or urethane, and where each one worksWhat CG1, CG2WA and RG on the bag mean, which grout to use in showers, kitchens and living floors, joint widths, sealing, cure times and regrouting.
- Inspection and handoverGlobalUAEChecking finished tiling: hollow tiles, lippage, flatness and groutHow to accept a tiling job yourself — tapping for hollows, steps between tiles, flatness under a 2 m straightedge, joints, grout and sealant, with UK and US limits.
- FloorsGlobalUAELarge-format porcelain floor tiles: base, adhesive, clips and jointsHow 60×120 and 120×120 porcelain goes down on a floor without hollows or lips — base flatness, adhesive class, back-buttering, levelling clips and joints.
Librae
Plan your renovation before you talk to contractors
Librae turns a floor plan into a 2D and 3D project with quantities and an estimate. Every contractor in the directory is checked by Librae.