Floors/Global · UAE
Engineered wood floors in a hot, humid climate
How to keep an engineered wood floor flat in a hot, humid place — room humidity, acclimatising, the base, floating or glued, and the gap at the walls.
Engineered wood is a thin layer of real wood on a stable core, and it still behaves like wood: it swells when the air is damp and shrinks when it is dry. In a hot, humid place it lasts well as long as the room air stays within the range its maker sets. Kährs, for example, asks for 30–60 % relative humidity before, during and after laying. Get that right, lay it on a dry, flat base and leave the floor room to move at the walls, and the climate outside does not matter much.
Most owners buy factory-finished click boards and have the shop's installer lay them, often over the existing tiles. Below is what the installer should check and what you control afterwards.
#Humidity is the whole story
Wood takes moisture from the air and gives it back. Kährs delivers its boards dry, at moisture that matches about 40 % room humidity, and expects the room to stay between 30 and 60 %. Havwoods gives a tighter band for the life of the floor: 18–22 °C and 45–65 %.
What happens outside the band:
- Too humid. Boards swell, push against the walls and cup: the edges rise above the middle. Kährs warns that above 60 % the deformation can become permanent.
- Too dry. Boards shrink and gaps open. Havwoods says small gaps in the dry season are normal and not a fault.
Buy a cheap digital hygrometer and keep it in the room. It tells you more about your floor than any brochure.
#Acclimatise or not?
The makers do not agree, so follow the one whose floor you bought.
- Kährs seals its boards at the right moisture (7 % moisture content in its US instructions) and says not to open the packs until you lay them. Opened early, they take up moisture and become hard to fit. The packs only need to reach 15 °C, which takes two to three days in a warm room.
- Havwoods asks for at least 72 hours in the room where the floor goes, stored flat, away from walls and out of direct sun. It adds that some makers need no acclimatising at all.
Either way, the room must already be at its normal living conditions: AC running, windows closed, wet work finished and dry.
#The base: dry, flat, strong
Flat. Kährs allows ±3 mm under a 2 m straightedge and ±1.2 mm over 0.25 m. Havwoods asks for no more than 3 mm under a 2 m straightedge. Grind high spots, fill hollows.
Dry. On a cement screed, Havwoods wants a hygrometer reading below 75 % RH for a floating floor, and an epoxy damp-proof membrane between 75 and 95 %. Kährs requires a 0.2 mm polythene sheet, overlapped 200 mm, on every new slab, slab laid on the ground, slab above a humid room and over underfloor heating; above 90 % RH even that is not enough. On an old slab that reads below 60 % RH, Kährs normally needs no barrier, which is the usual case over tiles in an older tower. Always measure a fresh screed in a new villa or a re-screeded flat.
Old tiles. Tap every tile and fix the hollow ones. In Emaar apartments the original tiles must stay anyway, so the wood goes on top; see old tiles under a new floor.
#Floating or glued
| Floating | Glued | |
|---|---|---|
| How | Boards click together on an underlay | Every board bonded to the base |
| Over tiles | Yes, on underlay | Yes, with an adhesive that allows tiles |
| Gap at walls | Grows with room width, at least 10 mm | Kährs: about 12 mm |
| Size limit | Kährs 5G: 15 m wide, 25 m long | Kährs: none, no breaks needed |
| Repair | Lift boards back to the damaged one | Cut out and re-glue |
Floating. Kährs lays a 2–3 mm foam underlay, on a polythene sheet where a barrier is needed. Kitchen units, wardrobes and partitions go in first, and nothing is ever fixed through a floating floor. Kährs also warns against resting the legs of a heavy stone worktop on it: the weight pins the floor.
Glued. Sika's one-part polyurethane parquet adhesive is a typical example. Its sheet for the Gulf lists old ceramic tiles as a base: degrease them with the maker's activator or grind the glaze off, and do a test patch on glazed tiles. The base must be strong (Sika asks for 1 N/mm²), and Sika warns that a moisture reading alone does not prove a base is ready. Keep the room at 15–35 °C and 40–70 % humidity while the adhesive goes down. Kährs asks for 24 hours before furniture and normal use.
#The gap at the walls
Every wood floor needs a gap at walls, columns, pipes, door frames and where it meets tiles.
Kährs' rule for floating floors: 1.5 mm per metre of floor width, and never less than 10 mm.
| Room width | Gap (Kährs) |
|---|---|
| up to 6 m | 10 mm |
| 8 m | 12 mm |
| 10 m | 15 mm |
Havwoods asks for at least 12 mm in rooms under 25 m² and 15 mm in larger ones. Use your maker's figure.
Three things go with the gap:
- Skirting covers it, it does not decide it. Kährs says pick the skirting to suit the gap, not the other way round. Fix skirting to the wall so it does not press the floor.
- Doorways. Kährs and Havwoods both divide the floor at doorways with a gap under a threshold strip. A single floor running through several rooms moves as one large sheet.
- Stagger the end joints by at least 500 mm, says Kährs, so the floor stays flat.
#What goes wrong
- Laid on a fresh screed without measuring. The floor takes the moisture and cups within weeks.
- AC off for a long trip in a humid season. Humidity climbs over 60 % and the boards swell.
- No gap, or skirting pressing the floor. Swelling has nowhere to go and the floor lifts.
- Kitchen island or wardrobe on a floating floor. It pins the sheet.
- Packs opened days early in a humid room, against the maker's instructions.
- Wet mopping and spills left to dry. Kährs says wipe them at once; beech and maple move more than other woods.
- Wood in a bathroom with a shower.
#How to check the work
- The installer measured base moisture and wrote the reading down.
- Room humidity during laying was within the maker's range.
- A gap is visible at every wall, column, pipe and door frame before the skirting goes on.
- Skirting is fixed to the wall and leaves the floor free.
- Doorways have a threshold or profile with a gap under it.
- End joints are staggered; no boards rocking or clicking underfoot.
- You have the maker's installation and care guide, and the batch numbers.
#When to call a professional
- Levelling a base, epoxy damp-proof membrane, or glue-down over tiles: a flooring contractor.
- Boards cupping or lifting: measure room humidity first, then ask the supplier to test base moisture before any boards are replaced.
- Water damage from a leak: stop the source and see leaks from the flat above.
Order boards from measured areas, not a guess. With the flat drawn in Librae, room areas and skirting lengths come from dimensions you confirmed. A flooring contractor booked through the project comes to see the floor at no charge, checks the plan room by room and prices against the same numbers.
#In the UAE
Keep the AC on. Flats here are air-conditioned, and that is what keeps a wood floor in its range. The risk is the summer trip with the AC off and the flat sealed, or a balcony door left open. If you are away, leave the AC running at a moderate setting and check humidity on return before the floor tells you.
Laying. The AC must run from delivery of the boards until the adhesive or the last row is done, so the room is at living conditions throughout.
Sun. Wood colour changes in daylight, fastest at first. Kährs advises no rugs in the first months so the whole floor matures evenly; anything that blocks the light leaves a paler patch.
Over developer tiles. The usual route in towers and the only one in Emaar apartments. Apply for the Home Modifications NOC before the floor goes in; other developers have their own process (developer NOCs). For a floor over tiles that copes better with water, see SPC and LVT vinyl.
#What the codes say
- BS 8201 is the British code of practice for wood flooring. Havwoods writes its installation sheet to complement it; the flatness and moisture figures above are Havwoods' and Kährs', not quoted from the standard.
- AMA Hus is the Swedish building specification Kährs follows for its installation methods.
- Adhesive data (temperature, humidity, base strength to EN 13892-8) come from the adhesive's product data sheet; the one used here is Sika's GCC edition, which also carries a low-emitting certificate for Dubai's Al Sa'fat green building system.
This guide explains good practice and cites the documents listed below. It is not a permit, a design approval or an engineering opinion. Work on electrical, gas, fire-safety and structural elements must be carried out by licensed professionals and approved by the relevant authority.
Sources
- Kährs, Installation guide, floating wood flooring with Woodloc 5G (2020-11), pp. 3–9 — Room humidity 30–60 % and 15 °C, permanent deformation above 60 %, sealed packs, base flatness, moisture barrier cases, underlay, gap of 1.5 mm per metre and at least 10 mm, size limits, fixtures first, skirting, doorways, staggering, colour change.
- Kährs, Woodloc Glue-Down Installation Instructions (US, February 2017), pp. 3–7 — Glue-down needs no expansion breaks and is not size-limited; half-inch perimeter gap; boards sealed at 7 % moisture; half-bathrooms only; 24 hours before furniture.
- Havwoods, Engineered wood flooring, floating installation (UK, 23 October 2017), written to complement BS 8201 — 3 mm under a 2 m straightedge, screed below 75 % RH, room 18–22 °C and 45–65 % RH, 72-hour acclimatisation, gaps of 12 and 15 mm, thresholds at doorways.
- Sika, SikaBond-52 Parquet product data sheet (GCC, January 2022, version 02.01) — One-part polyurethane adhesive for engineered wood; old ceramic tiles as a base; 15–35 °C and 40–70 % RH during laying; base strength 1 N/mm²; moisture readings alone not enough; low-emitting certificate for Dubai's Al Sa'fat.
- Emaar Community Management, Home Modifications fact sheet (2022, archived copy) — In apartments the existing tiles may not be removed; new finishes go over them.