Tiles and wall finishes/Global · UAE
Tile grout: cement, epoxy or urethane, and where each one works
What CG1, CG2WA and RG on the bag mean, which grout to use in showers, kitchens and living floors, joint widths, sealing, cure times and regrouting.
Grout comes in three families. Cement grout is cheap and easy, and a good one (class CG2WA) works almost anywhere. Epoxy costs more and is harder to apply, but needs no sealing and resists stains and acids: the strong choice for busy showers and kitchen worktops. Ready-mixed urethane or acrylic grout sits in between: no mixing, no sealing, but a slow cure. Whichever you pick, floor joints are at least 3 mm, and corners and movement joints get sealant, not grout.
#The three families
| Cement | Epoxy | Ready-mixed (urethane, acrylic) | |
|---|---|---|---|
| Class on the pack | CG1, CG2, CG2WA | RG | None under EN 13888; US makers quote ANSI tests |
| Joint range (makers' sheets) | Mapei Ultracolor Plus: 2–20 mm | Mapei Kerapoxy CQ: from 1 mm (EU), 1.5–10 mm (US) | Custom Fusion Pro: 1.6–13 mm; Bostik Dimension: 1.6–13 mm floors, up to 6 mm walls |
| Sealing | Ask the grout maker | Not needed | Not needed |
| Working time | Use the mix within 20–25 min | Use within 45 min, wash tiles while fresh | No mixing; small areas at a time |
| Light foot traffic | About 3 h | 24 h | 24 h |
| Water | Use after 24 h, basins after 48 h | Use after 4 days, immersion after 10 | Shower after 7 days (Fusion Pro) or 3 (Dimension) |
| Acids and stains | Mapei: acids above pH 3 only | Very resistant | Bostik passes a 3% vinegar test |
Figures are from the makers' sheets at about 21–23 °C. Heat and dry air change them, see the UAE section.
#What the letters on the bag mean
The European grout standard EN 13888 gives:
- CG1: basic cement grout.
- CG2: improved cement grout that passes at least one extra test: W for low water absorption, A for high abrasion resistance. CG2WA passes both.
- RG: reaction resin grout, in practice epoxy. One class only.
Buy the class, not the brand. A bag with no class tells you nothing about what it meets.
#Which grout where
- Dry walls, living-room and bedroom floors. CG2WA. CG1 does on a wall that never gets wet, but the saving is small.
- Shower walls and floors. Epoxy if the shower gets daily use; CG2WA if you clean it regularly. The Tile Association asks for water-resistant grout in showers. Grout is not your waterproofing, the membrane behind the tile is: see waterproofing and the flood test.
- Tiled worktop, and the splashback behind the sink and hob. Epoxy. Fat, wine, coffee and lemon stain cement grout, and Mapei's US sheet lists worktops among epoxy's uses. A splashback away from the sink and hob does fine with CG2WA.
- Large-format porcelain floors. CG2WA or epoxy. See large-format porcelain floor tiles.
- Underfloor heating. At least CG2, says the Tile Association.
- Marble, limestone, porous or textured tiles. Test first. Custom and Bostik ask for such tiles to be pre-sealed, because coloured grout can stain them. Mapei warns that epoxy can stain light marble.
- Ready-mixed grout. Read the limits: Custom rules out steam rooms and pools; Bostik rules out pools and regrouting showers.
#Joint width
The tile sets the width, then the grout's range has to fit it. Rule of thumb: plan floor joints at 3 mm. That meets the UK minimum, and the US minimum for rectified tiles in a brick pattern. Calibrated tiles in a brick pattern need 4.5 mm under US practice. If your contract names a rulebook, its numbers win.
| UK (BS 5385) | US (ANSI A108.02) | |
|---|---|---|
| Floors | At least 3 mm, at least 6 mm deep where the tile allows; as a rule no wider than the tile is thick, around 10 mm if sizes vary | — |
| Walls, tiles under 0.1 m², no side over 600 mm | At least 2 mm | — |
| Walls, tiles 0.1–1 m², no side over 1,200 mm | At least 3 mm | — |
| Wall panels 3 m long | 5 mm | — |
| Brick pattern, a side over 15 in (about 380 mm) | — | Average at least 3 mm rectified, 4.5 mm calibrated |
Then check the grout: a 1.5 mm joint is too narrow for Ultracolor Plus (2 mm minimum), and 15 mm is too wide for Fusion Pro or the US Kerapoxy CQ.
#Sealing
- Epoxy and ready-mixed: the makers say no sealer.
- Cement grout: porous, though CG2W takes up less water. Whether and when to seal is the grout maker's call. If it names a sealer, use that one and wait as long as its label says.
- Sealant, not grout: wall to floor, wall to bath, internal corners and every movement joint. Grout cracks there as the building moves. Mapei, Custom and Bostik all ask for flexible sealant. Where movement joints go is in large-format porcelain floor tiles.
#Grouting and curing
- Wait for the adhesive. On floors Mapei grouts 24 hours after a normal adhesive, 3–4 hours after a fast-setting one. Too early and tiles shift under the float.
- Clear the joints. Take out spacers and adhesive to at least two thirds of the tile depth while the adhesive is fresh.
- Grout small areas. Sponge cement grout off once it loses its shine, after 15–30 minutes per Mapei. Wash epoxy off straight away with plenty of water. Sponge ready-mixed grout within minutes.
- Keep the tile faces clean. Hardened epoxy leaves a haze that needs hot air or a special cleaner. Skinned-over ready-mixed grout is just as stubborn.
- Respect the cure. No mopping, shower or rugs before the times in the table.
#Regrouting
Grout that is dark, cracked or mouldy on sound tiles is the cheap fix.
- Tap the tiles. If large areas sound hollow or tiles move, new grout will not hold.
- Rake out the old grout with a grout saw or oscillating tool, to at least two thirds of the tile depth. Bostik asks for complete removal.
- Vacuum, wash and let the joints dry fully.
- Grout, let it cure, then renew the sealant in the corners.
Never skim new grout over old. Check your product's sheet first: Bostik does not allow its ready-mixed grout for regrouting showers.
#What goes wrong
- Too much water in cement grout, or washing too early. Patchy colour, dusty surface.
- Grouting before the adhesive has set. Tiles move, the joint cracks along one edge.
- Joints too narrow for the tile. Grout does not go in, and lippage looks worse.
- Shower used too soon. Ready-mixed grout needs days, not hours.
- Acid cleaners. Mapei rates its cement grout for acids above pH 3 only and asks you to test any acid cleaner on the grout first and rinse well. Bostik advises against acid cleaners on its ready-mixed grout.
#How to check the work
The full check of a finished tiling job is in checking finished tiling. For the grout:
- The pack shows the class (CG2WA or RG) and colour batch, and it is the product you agreed.
- Joints are even and fit both the tile rule and the grout's range.
- Joints are full to the tile edge, without holes or dips.
- Corners, the wall-to-floor line and movement joints have sealant, not grout.
- No haze on the tiles after the final clean.
- You know when the shower and floor can be used.
#When to call a professional
- Epoxy over a whole bathroom or a large floor, if you have not used it before.
- Grout that keeps cracking along the same lines: the cause is movement or loose tiles, not the grout.
- Hollow tiles over large areas, or a leak below the shower: regrouting will not fix it.
For a regrout or retiling, put the grout type into the estimate line itself. In a Librae project that line goes into the version issued "For works" with a number. If the tiler would rather use another grout, they can propose it, but the line changes only when you approve.
#Hot climates and the UAE
- Heat. Mapei limits its cement grout to 35 °C and its epoxy to 30 °C. Bostik says not to grout when the tile surface is above 38 °C. In summer, grout with the AC on and terrace doors shut.
- Dry air. In hot, dry or windy conditions Mapei asks for cement grout to be dampened a few hours after grouting. Air-conditioned rooms are dry, so do the same. Bostik notes that low humidity speeds up the cure of its ready-mixed grout.
- Emaar apartments. The original developer tiles may not be removed, so regrouting is the cheapest way to refresh a bathroom. Any retiling, even over the old tiles, needs a Home Modifications application, and the contractor needs an entry permit even for work that needs no approval. Details are in large-format porcelain floor tiles.
#What the codes say
For readers who want to know where the numbers come from.
- Grout classes: EN 13888 (now EN 13888-1:2022) and ISO 13007-3 define CG1, CG2 with W and A, and RG. Summary from the Tile Association's Tiling Guide and Mapei's data sheets. Ready-mixed urethane and acrylic grouts are outside EN 13888; their US makers quote the ANSI A118 series.
- UK joint widths: BS 5385-1:2018 for internal walls; BS 5385-3 for floors, as summarised by the Tile Association. BS 5385-3 was revised in 2024; the floor figures here come from the Tile Association's 2020 summary of the previous edition.
- US practice: ANSI A108.02 clause 4.3.8.1 for joints in brick patterns. The Ceramic Tile Education Foundation (2025) quotes it for tiles with a side over 15 inches; Laticrete quotes an older 18-inch (450 mm) wording. Epoxy grouts are tested to ANSI A118.3; Bostik states that Dimension exceeds ANSI A118.19.
- Product limits (joint ranges, temperatures, cure times) come from each maker's data sheet and apply only to that product.
This guide explains good practice and cites the documents listed below. It is not a permit, a design approval or an engineering opinion. Work on electrical, gas, fire-safety and structural elements must be carried out by licensed professionals and approved by the relevant authority.
Sources
- Mapei Ultracolor Plus, technical data sheet (UK) — Class CG2WA; joints 2–20 mm; joints cleared to two thirds of tile thickness; grouting 24 h after normal floor adhesive; light traffic about 3 h, use 24 h; 5–35 °C; only acids above pH 3; dampen in hot, dry weather; no grout in movement joints.
- Mapei Kerapoxy CQ, technical data sheet (EU) — Class RG; joints from 1 mm; pot life 45 min; 12–30 °C; clean while fresh; light traffic 24 h, use 4 days, immersion and chemicals 10 days.
- Mapei Kerapoxy CQ, product data sheet (US) — Joints 1.5–10 mm; no sealer required; ANSI A118.3.
- Custom Building Products, Fusion Pro, TDS-242 (published 12 March 2024) — Ready to use; joints 1.6–13 mm; no sealing; cures by evaporation; 24 h light traffic; 7 days before shower use; not for steam rooms, pools or movement joints; 10–32 °C.
- Bostik Dimension with RapidCure, technical data sheet (8 August 2025) — Pre-mixed, urethane binder; floor joints 1.6–13 mm, wall joints up to 6 mm; 3 days before intermittent water; 7 days before cleaners; not for regrouting showers; do not grout above 38 °C tile surface; old grout removed completely first.
- The Tile Association, Tiling Guide (2020), sections 4, 9, 11, 13 — EN 13888 classes; BS 5385-1 wall joint widths; BS 5385-3 floor joints at least 3 mm and 6 mm deep where practicable; water-resistant grout in showers; minimum CG2 on heated floors.
- The Tile Association, changes in BS 5385-1:2018 (press note) and BAL note on BS 5385-1 (26 July 2018) — Wall joints 2 mm, 3 mm and 5 mm between 3 m panels.
- Laticrete TDS 164, Lippage – Causes and Prevention — US rule ANSI A108.02 4.3.8.1 on minimum joints in a brick pattern (older 18-inch wording).
- Ceramic Tile Education Foundation, Offsets, grout joints and customer expectations (6 May 2025) — ANSI A108.02 4.3.8.1 as currently quoted — brick pattern with any side over 15 in, average joint at least 1/8 in rectified, 3/16 in calibrated.