Floors/Global · UAE
SPC and LVT vinyl floors: click or glue-down?
Click rigid-core (SPC) or glue-down LVT? What the base must be like, laying over old tiles, gaps at walls and doors, and sun through big windows.
Vinyl floors come in two systems. Rigid-core click planks, sold as SPC, lock together and float on the base without glue. Glue-down LVT is a thinner, flexible plank stuck to a perfectly smooth base. In most flats the choice is click: it goes straight over sound old tiles, needs no wet trades and can be lifted again. Glue-down needs a base as smooth as glass, so old tiles first disappear under a levelling compound.
Either way, the floor must be free to move with heat, and in a sunny room that is where most failures start.
#Click or glue-down
Karndean makes both kinds, and its guides set them side by side:
| Rigid-core click (SPC) | Glue-down LVT | |
|---|---|---|
| Base flatness | 5 mm over 3 m | 3 mm over 2 m |
| Over old tiles | Yes, if lips ≤ 1 mm and grout lines small | Only after at least 3 mm of smoothing compound |
| Base moisture | Below 85 % RH (Korlok: 95 %) | Below 75 % RH |
| Gap at walls | 5–10 mm, never glued | Not a floating floor |
| Near big windows | Gaps essential; avoid long direct sun | Special adhesive; epoxy above 50 °C |
| Repair | Lift and replace planks | Cut out and re-glue |
Over tiles you are keeping, in an ordinary living room or bedroom, click is the simpler job.
#Over the old tiles
Many flats keep the developer's tiles and lay the new floor on top. In Emaar apartments there is no choice: the original tiles may not be removed. Tiles laid by a previous owner can come up if you state it in the application and the neighbours below give their consent. More on this in large-format porcelain.
What the tiles must be like:
- Firm. Tap every tile. Hollow or loose ones are fixed or replaced first; a loose tile under a click floor rocks and breaks the joints above it.
- Flat. Lay a 2–3 m straightedge in several directions. For rigid core Karndean allows no more than 5 mm below level over 3 m. High spots are ground off.
- Small steps and joints. For Karndean's i4F click floor, lips between tiles up to 1 mm, grout lines up to 4 mm wide and 2 mm deep. For its Korlok floor, fill any grout line wider or deeper than 5 mm. Wider joints show through as lines in the vinyl.
- Clean. No wax, grease or dust.
For glue-down LVT, degrease, abrade and prime the tiles, then cover them with at least 3 mm of smoothing compound, often in two coats to hide the grout lines.
#Underlay and moisture
Many rigid-core planks come with an underlay bonded to the back; check the box. Karndean says a separate underlay is not recommended under its i4F floor, and that soft acoustic underlays, cushioned floors and other floating floors are not a suitable base. Another soft layer lets the joints flex until they break. Use only what your product's guide allows.
Check moisture on new screed, ground floors and villa slabs. Karndean wants the base below 85 % RH for i4F and 95 % for Korlok, measured with a hygrometer. Glue-down is stricter: below 75 % RH, or 2 % by carbide (CM) test for a cement screed. Wetter bases need a damp-proof membrane first.
#Gaps: where the floor must be free
A floating floor moves as a single sheet. It needs room at every edge.
- Walls and fixed objects. Karndean's Korlok guide asks for at least 5 mm; its i4F guide for at least 10 mm, measured at the narrowest point. Same maker, different product: read your own guide.
- Pipes. Drill the hole larger and keep the same gap all round.
- Door frames. Undercut the frame and architrave so the floor slides under, rather than cutting the plank round it.
- Skirting. Fix it to the wall, not the floor. Karndean asks for 0.5 mm clearance above the planks and no sealant between skirting and floor.
- Kitchen units and islands go in first. The floor stops short of them with a gap under the kickboard. A floor trapped under a heavy island cannot move.
- Long runs. For i4F, a run over 30.5 m gets a 10 mm movement joint across it.
The only place the gap may be sealed is a small wet room: Karndean allows flexible sealant in wet areas of 4 m² or less, separated from the rest of the floor at the door.
#Sun through big windows
Karndean's guide explains it: sun through glass heats only a strip of floor in front of the window, and only that strip expands. If the edges are tight, the floor rises in a ridge. It also asks for rigid core to be protected from heat and long direct sun, which can damage or discolour it.
What helps:
- Keep the full gap along the window wall and at both ends of the room.
- Do not pin that edge with a heavy unit or a tight skirting.
- Use blinds or curtains in the hours of direct sun, especially in the first weeks.
Glue-down LVT near floor-to-ceiling glass needs the right adhesive. Karndean names its recommended adhesive for floors that can reach 50 °C and epoxy adhesive where they can get hotter. Keep the room at 18–27 °C for 24 hours before laying, during it and for 24 hours after. Shade the windows before laying and for at least 48 hours after.
#Laying a click floor, step by step
- Acclimatise. Boxes go into the room 48 hours before laying, flat, no more than five high, at 18–27 °C.
- Check the base as above. Fix it before the first plank.
- Order 10 % extra for cuts, as Korlok's guide suggests.
- Plan the rows so the first and last rows are not slivers. Mix planks from several boxes for an even look.
- Lay with spacers at every wall. Stagger the end joints.
- Click, do not force. A hand roller or a tapping block with an offcut. No adhesive anywhere.
- Remove the spacers. Fix skirting or scotia to the wall and fit door trims so they do not pin the floor.
#What goes wrong
- No gap, or skirting nailed into the floor. The floor peaks, usually in the sunniest spot.
- Kitchen island or built-in wardrobe on top of the floor. It pins the sheet.
- Laid over loose or wavy tiles. Joints click open and creak, or the floor bounces.
- Extra foam underlay under a plank that already has one. Joints flex and break.
- Boxes stored in a hot car or a hot flat with no AC, then laid straight away.
- Glue-down straight onto tiles without compound. Grout lines show through.
- Long sun on a new floor with no blinds. Local expansion and fading.
#How to check the work
- A coin or wedge fits into the gap at each wall, pipe and door frame.
- Skirting is fixed to the wall and not pressing the floor.
- Nothing heavy stands on the floor's edge or across it permanently.
- No joint is open, no plank is raised; walk the room and listen for clicking.
- Door leaves swing clear over the new floor; sliding wardrobe and balcony doors still run.
- Along the window wall the gap is the full width, end to end.
- You have the product's guide and a spare box for repairs.
#When to call a professional
- Grinding high spots, levelling compound, a damp-proof membrane or any glue-down floor: a flooring contractor.
- A floor that keeps lifting after the edges are freed: ask the supplier to check the base moisture and the product.
A click floor over tiles is priced by area, plus skirting and the trims at doors. Librae takes floor areas and skirting lengths from the plan, so you hold the flooring quote against your own quantities. Flooring contractors are listed in its directory only after Librae has checked their licence.
#In the UAE
AC on. The 18–27 °C range for storing and laying is easy in an air-conditioned flat and hard on a summer site without AC. Keep the AC running from delivery to the end of the job.
Over developer tiles. The common route in towers. In Emaar apartments it is the only one: original tiles stay. You still apply for a Home Modifications NOC on the Emaar community portal, and the contractor needs an entry permit. Other developers and communities have their own rules; see developer NOCs.
Entrance door. The new floor sits higher than the tiles, and the flat's entrance door may be a fire-rated door. Do not trim it without asking FM; finish the floor at the threshold with a trim instead.
Big windows. Floor-to-ceiling glazing on a sunny side is where click floors fail first. Plan the full gap on that side, keep it free, and use blinds in the afternoon.
Wet rooms. Rigid core is allowed in ordinary bathrooms, not in rooms that stay wet. Keep tiles in the shower itself.
#What the codes say
- BS 8203 is the British code of practice for laying resilient floors. Karndean quotes its flatness limit of 3 mm over 2 m for glue-down floors and names it as the UK standard for its rigid-core floor. The numbers above are Karndean's.
- Moisture tests: hygrometer readings in % RH; carbide (CM) tests for cement and calcium sulphate screeds.
This guide explains good practice and cites the documents listed below. It is not a permit, a design approval or an engineering opinion. Work on electrical, gas, fire-safety and structural elements must be carried out by licensed professionals and approved by the relevant authority.
Sources
- Karndean Designflooring, Rigid core with i4F drop-lock technologies, Installation Guidelines, KD7759GLO (July 2023), pp. 2–3 — Acclimatisation, room temperature, base flatness and moisture, laying over ceramic tiles, no extra underlay, 10 mm gap, 30.5 m runs, no adhesive, sun through glass, sealant in small wet areas, fixtures first.
- Karndean, Laying a Korlok plank or tile rigid core floor, KD7419UK (fitting guide hosted by Howdens) — 5 mm minimum gap, base moisture below 95 % RH, 5 mm over 3 m, levelling grout lines over 5 mm, 48 h acclimatisation, 10 % waste.
- Karndean Designflooring, Gluedown Installation Guidelines, KD5445GLO (04/20), pp. 1–2 — Base 3 mm over 2 m (BS 8203), moisture below 75 % RH or 2 % CM, at least 3 mm smoothing compound including over tiles, adhesives for areas next to glazing up to and above 50 °C, temperature and shading around installation.
- Emaar Community Management, Home Modifications fact sheet (2022, archived copy) — In apartments the existing tiles may not be removed; new finishes go over them; works need a Home Modifications NOC.