Regions/45 guides
UAE
Renovation in the United Arab Emirates: rules, climate, utilities and who is responsible for what.
Permits, contracts and money11
- Permits, contracts and moneyUAE › DubaiRenovation permits for an apartment in Dubai: who approves whatFor most Dubai flats the renovation permit is an NOC from the developer or building management. The steps, documents, fees, and when authorities step in.
- Permits, contracts and moneyUAE › DubaiVilla renovation and extension permits in Dubai: what you needWhich approvals a Dubai villa needs for a refit, pergola, pool or extension, in what order, who files them, and what the developers refuse outright.
- Permits, contracts and moneyUAE › DubaiRenovating a rented apartment in Dubai: what a tenant may doWhat a Dubai tenant may change in a rented flat, how to get the landlord's consent and building approval, why partitions mean trouble, and what happens at move-out.
- Permits, contracts and moneyUAEHow to check a renovation contractor's licence in the UAETrade licence, activities, Dubai Municipality and DEWA registration, insurance and VAT number. Where to check each one online before you pay an advance.
- Permits, contracts and moneyUAE › DubaiDeveloper NOC for renovation in Dubai: Emaar, Nakheel, DAMAC, waslWhere to apply for a renovation NOC in Dubai, what each developer or management company asks for, published fees and timings, and how to get the deposit back.
- Permits, contracts and moneyUAE › DubaiWater leak from the apartment above in Dubai: what to do, who paysWater coming through your ceiling in a Dubai flat? Who to call first, how the source is found, who repairs and pays, what insurance covers and where to complain.
- Permits, contracts and moneyUAEDeveloper defects liability in the UAE: the 1-year and 10-year rulesWhat a UAE developer must still fix after handover, for how long, how to report a defect so it counts, where to escalate in Dubai, and how a renovation can affect it.
- Permits, contracts and moneyUAEDispute with a renovation contractor in the UAE: where to goWhat to do when a fit-out contractor leaves defects, stops work or asks for more money, and which body in Dubai actually hears the dispute, step by step.
- Permits, contracts and moneyUAE › DubaiDDA, Trakhees, Emaar or Nakheel: who approves your Dubai renovationWhose rules apply to a renovation in a Dubai community, where you apply first, and when DDA, Trakhees or Dubai Municipality really come in. A matrix by community.
- Permits, contracts and moneyUAE › Abu DhabiRenovation permits in Abu Dhabi: DMT, minor works and full permitsWho approves a renovation in Abu Dhabi, what DMT's simplified minor-works route covers, when a maintenance or full building permit is needed, and who files it.
- Permits, contracts and moneyUAE › DubaiPartitions in rented flats in Dubai: the ban, fines and raidsWhen a partition in a Dubai flat is legal, what the 2026 shared housing law changed, how inspections work, and who is fined or evicted, landlord or tenant.
Planning and layout1
Plumbing and water heating1
Bathrooms and wet areas1
Electrical and lighting1
Cooling and air4
- Cooling and airUAE › DubaiDistrict cooling in Dubai: how it works and what the bill coversWhere the cold in your flat comes from, what each line on an Empower or Emicool bill means, who fixes the fan coil, and where to take a disputed bill.
- Cooling and airUAEFan coil unit (FCU) in a UAE flat: how it works, who maintains itHow the fan coil above your ceiling cools the flat, how to use its thermostat, what you can clean yourself and what the building's FM or AC company should do.
- Cooling and airUAEChiller, VRF or split: what cools UAE homes and how to tell yoursDistrict cooling, a building chiller, VRF, ducted split or wall split. How to tell which one your flat or villa has, who runs it, how you pay and what you may change.
- Cooling and airUAEAC leaking water from the ceiling: fan coil drain problems in the UAEWhy a fan coil or split AC drips in UAE homes, what to do in the first minutes, what you can check yourself, what FM should fix, and how to save the ceiling.
Smart home1
Inspection and handover3
- Inspection and handoverUAENew apartment handover in the UAE: snagging and defects liabilityWhat to check before you take the keys from a UAE developer, how to record snags, and how long the developer must fix defects under Dubai and UAE law.
- Inspection and handoverUAEIndependent quality control during a renovation in the UAEWhat independent site supervision is, what it checks at each stage before walls and floors are closed, how it ties to stage payments, and what it costs via Librae.
- Inspection and handoverUAEFalse fire alarms during renovation in UAE towers: how to avoid themWhy renovation dust sets off the building fire alarm, how FM isolates detectors, what dust covers can and cannot do, who pays the fine, and what to check when works end.
General guides with a section on the UAE22
- Electrical and lightingGlobalUAE48V magnetic track lighting: track types, drivers and dimmingHow a 48 V magnetic track works, which track suits which ceiling, how to size and place the drivers, and what to settle before the ceiling is closed.
- Planning and layoutGlobalUAEApartment renovation: order of works and how long to waitThe right order of trades in a flat renovation, the drying and curing waits you cannot skip, where contractors break the sequence, and where UAE permits fit in.
- Walls, partitions and ceilingsGlobalUAEDrywall board types and metal studs: what to use where, how to checkHow to read the EN 520 code on plasterboard, which board goes in a bathroom, when you need cement board, and how to check metal studs on site.
- Plumbing and water heatingGlobalUAEHow to connect a water heater: valves, discharge and first fillWhich valves go on a storage water heater, where the relief water should drain, how to fill and switch it on, and what the Dubai Building Code adds.
- Inspection and handoverGlobalUAESmoke pencil, smoke machine or peppermint test: what each one findsWhat a smoke pencil, a drain smoke machine and a peppermint test can and cannot show, how each is done, and why smoke near a detector in a UAE tower needs FM first.
- Inspection and handoverGlobalUAEAccepting a renovation: snag list room by roomHow to inspect a finished renovation, write snags a contractor cannot argue with, and hold back payment until they are fixed, with notes for UAE flats.
- Walls, partitions and ceilingsGlobalUAEPlasterboard ceilings: hangers, grid and access panels for the FCUHow a suspended plasterboard ceiling is hung and where the access panels go, so the fan coil, valves and water heater above it can be serviced and replaced.
- FloorsGlobalUAESPC and LVT vinyl floors: click or glue-down?Click rigid-core (SPC) or glue-down LVT? What the base must be like, laying over old tiles, gaps at walls and doors, and sun through big windows.
- Bathrooms and wet areasGlobalUAEWalk-in shower without a tray: drain, falls and floor heightPoint drain or linear drain, how much fall a tiled shower floor needs, how high the floor build-up gets, and what UAE buildings allow when you move a drain.
- FloorsGlobalUAEEngineered wood floors in a hot, humid climateHow to keep an engineered wood floor flat in a hot, humid place — room humidity, acclimatising, the base, floating or glued, and the gap at the walls.
- Tiles and wall finishesGlobalUAETile grout: cement, epoxy or urethane, and where each one worksWhat CG1, CG2WA and RG on the bag mean, which grout to use in showers, kitchens and living floors, joint widths, sealing, cure times and regrouting.
- Planning and layoutGlobalUAEWhich walls can you remove? Load-bearing walls, shafts and rulesHow to tell which walls you may touch in a renovation, which ones belong to the building, and what Dubai developers allow, with Emaar's ban on wall removal in flats.
- Electrical and lightingGlobalUAEElectrical testing after a renovation: tests, numbers, certificateWhich tests an electrician runs on new wiring, what results are acceptable, which certificate you should receive and how to read it, and how it works in Dubai.
- Inspection and handoverGlobalUAEChecking finished tiling: hollow tiles, lippage, flatness and groutHow to accept a tiling job yourself — tapping for hollows, steps between tiles, flatness under a 2 m straightedge, joints, grout and sealant, with UK and US limits.
- FloorsGlobalUAELarge-format porcelain floor tiles: base, adhesive, clips and jointsHow 60×120 and 120×120 porcelain goes down on a floor without hollows or lips — base flatness, adhesive class, back-buttering, levelling clips and joints.
- Bathrooms and wet areasGlobalUAEMould in the bathroom and behind furniture: causes and removalWhy mould grows on bathroom ceilings, round AC grilles and behind wardrobes, how to clean it safely, and how to stop it returning in an air-conditioned home.
- Permits, contracts and moneyGlobalUAEFit-out contractor contract: what to check before you signScope and drawings, specification, stage payments and retention, variations, defects period, insurance and damage to neighbours. A checklist for renovation contracts.
- Tiles and wall finishesGlobalUAEPainting walls: preparation, primer, coats and humid climatesThe right order for painting walls, which primer, how many coats, drying times, how much paint to buy, and what heat, humidity and AC change in the UAE.
- Bathrooms and wet areasGlobalUAEBathroom electrics: zones, IP ratings and 30 mA RCDsWhere lights, fans, towel rails, mirrors and shaver sockets may go in a bathroom, which IP rating to buy, what RCD protection is needed, and Dubai's stricter rules.
- Plumbing and water heatingGlobalUAEPPR pipes: fusion welding, fibre pipe and expansionHow PPR water pipes are welded, heating times by size, which pipe to use for hot water, and when a hot run needs room to expand. Notes for UAE homes.
- Plumbing and water heatingGlobalUAESewer smell in an apartment: how to find the sourceFind the source of a drain smell, starting with the usual cause, a dry trap. Then suction, seals, hoses, AC drains and the stack, and who fixes what in UAE towers.
- Permits, contracts and moneyGlobalUAERenovation estimate explained: what is in it and where money hidesHow to read a renovation quote line by line, what labour, materials, contingency and provisional sums mean, and how the price grows after you sign.
Librae
Plan your renovation before you talk to contractors
Librae turns a floor plan into a 2D and 3D project with quantities and an estimate. Every contractor in the directory is checked by Librae.