Permits, contracts and money/UAE › Dubai
Renovating a rented apartment in Dubai: what a tenant may do
What a Dubai tenant may change in a rented flat, how to get the landlord's consent and building approval, why partitions mean trouble, and what happens at move-out.
As a tenant in Dubai you may not change anything in the flat without the landlord's permission. The tenancy law says so for changes, restoration and even maintenance, and the standard Ejari contract asks for the permission in writing. Even with consent, the building's rules still apply: for small jobs that usually means only a pass for your contractor, for a kitchen, floors or anything bigger an NOC from the management company. Repairs that affect your use of the flat are the landlord's responsibility unless the contract says otherwise. At move-out you hand the flat back as you received it, apart from normal wear, and anything you built in stays unless you agreed otherwise.
#What tenants usually do
Most tenants do small things: paint a room, mount a TV, put up shelves and curtains, change light fittings. Fewer redo a kitchen or bathroom, and when they do, it is usually agreed with the landlord at the start of a long lease. The steps are the same; a bigger job just means more paperwork.
Read your contract and any addendum. The Ejari contract says you make no modifications without the landlord's written approval and are liable for damage they cause. An addendum may allow small works or say who repaints at the end.
Write to the landlord with the scope. List the works, materials and colours, attach photos or a sketch, and ask for a signed reply or at least an e-mail. Settle three things in the same letter: who pays, whether the work stays or is removed at move-out, and whether the deposit is affected.
Find out how the building wants the request. It varies:
- wasl is your landlord: request an "Approval (NOC)" in the wasl app or website. The fee is AED 545 where it applies and is not refunded if the request is rejected. wasl takes a refundable deposit for putting the work back to the original condition, approves in about 7 working days and issues an NOC valid for 3 months.
- DAMAC building: you can submit the fit-out request in DAMAC Living; your landlord approves or rejects it in the app.
- Meraas community: a tenant may apply for a minor modification NOC through RealConnect.
- Emaar community: Emaar's published process runs through the owner's portal account, so ask the landlord or their agent to apply, or ask Emaar Community Management whether it accepts your request with the landlord's letter.
- Other buildings: ask the management office whether the owner must apply or whether your request with the landlord's letter is enough.
The developer-by-developer detail is in developer and management NOCs.
Painting, a TV, shelves: most buildings want no NOC for these, only a pass for whoever does the work. In Emaar communities internal painting needs no NOC, but every contractor needs an entry permit. In Dubai Holding communities a one-day handyman job gets same-day access; work over several days needs a Minor Modifications Permit in the community app. wasl, as a landlord, wants its approval request even here.
Contractor and passes. The contractor needs a Dubai trade licence and an entry permit from the building, as in the general permit guide.
Keep the papers together: landlord's consent, NOC, receipts, before and after photos. You will need them at move-out.
No government authority is involved in the usual tenant jobs: Dubai Municipality treats painting, new floors, doors and suspended ceilings as basic maintenance that needs no permit. That does not replace the landlord's consent or the building's rules.
A landlord says yes faster to a drawing than to a description. Plan the works in Librae and attach the plan and the estimate to your letter: it goes line by line, with demolition, waste removal and 5% VAT shown separately, so the landlord sees the whole job. The version you finally agree is issued "For works" with a number, and at move-out you can show exactly what was agreed.
#Repair or alteration?
The law only sets the outline. The landlord keeps the flat in repair, including fixing defects that affect your use of it, unless the contract says otherwise. You look after the flat as a reasonable person looks after their own, and do the small upkeep agreed in the contract or usual for tenants. Anything beyond that needs permission. The table below is a rule of thumb, not a legal list: your contract decides the details, and nothing official says which jobs are "usual for tenants".
| Job | Usually whose | Ask the landlord first? |
|---|---|---|
| AC not cooling, leak, broken heater | Landlord | Report it in writing |
| Small upkeep your contract puts on you | Tenant | No |
| Repainting in the same colour | Agreed in contract | Yes |
| New colour, wallpaper, wall-mounted TV, shelves | Tenant's choice | Yes, in writing |
| New kitchen, tiles, flooring, ceilings | Tenant's choice | Yes, plus building NOC |
| Moving walls, partitions, plumbing points | Rarely allowed | Yes, plus building and possibly authority approvals |
If the landlord ignores a repair, do not hire a contractor and deduct it from rent unless they agree in writing; see the leak guide for how to put repairs on record.
#Partitions: think twice
A partition that creates an extra room, even for a home office, is an alteration. It needs the landlord's written consent and the building's NOC; in Trakhees areas any partition above 1.8 m also needs Trakhees approval. Ask management whether it is allowed at all before you buy materials, and agree with the landlord who takes it down at move-out.
Partitions built to rent out rooms bring more trouble:
- Sub-letting any part of the flat needs the landlord's written consent. Without it the landlord can seek eviction before the lease ends.
- Shared housing is regulated by Dubai Law No. 4 of 2026. A unit may be used for shared housing only with a Dubai Municipality permit, the unit must meet building and fire standards, and tenants may not sub-lease any part of a shared unit. Fines run from AED 500 to AED 500,000 and double for a repeat within a year, up to AED 1 million.
- Safety. Before a shared housing permit is issued, Dubai Municipality checks that the fire alarm and firefighting systems meet Civil Defence requirements. A new partition can leave part of a room without a sprinkler or detector, and only the building's fire contractor may change those systems.
#Moving out and the deposit
- Condition. You return the flat as you received it, except for ordinary wear and damage you could not prevent. The law does not list what counts as wear, which is why the consent letter and photos matter.
- Improvements. Unless you agreed otherwise, you may not take out what you built in. A new kitchen stays, and the law does not make the landlord pay for it.
- Deposit. The landlord holds it to cover the flat's upkeep at the end of the lease and must return it, or what is left of it, when the lease ends.
- Building deposit. If the building took a deposit for your works, as wasl does, its refund follows the building's own process, separate from the landlord's.
- Disputes go to the Rental Disputes Settlement Centre. Dated move-in and move-out photos and the consent letter are your evidence.
#What goes wrong
- Verbal consent. At move-out the landlord remembers "a small change"; you remember a kitchen. Only the letter counts.
- No end-of-lease clause. Without "stays" or "removed" in writing, the default is that the work stays and you get nothing for it, and the landlord may still say the flat is not as you received it.
- Building NOC skipped because the landlord agreed. Security turns the contractor away, or management issues a violation notice. Under the Ejari contract you answer for damage caused by changes.
- Fixing the landlord's repair and deducting it. That turns a repair claim into a rent dispute.
- Partitioning to share costs. Unpermitted shared housing and sub-letting without consent are grounds for eviction and fines.
- No move-in photos. Every mark becomes your mark.
#How to check
- Contract and addendum read for repairs, alterations and repainting.
- Landlord's written consent names the scope, who pays and what happens at move-out.
- Building NOC or permit issued, if the building requires one.
- Contractor has a Dubai trade licence and an entry permit.
- Dated photos at move-in, before works, after works and at move-out.
- Receipts and NOC kept with the tenancy contract.
#When to call a professional
- Anything touching walls, plumbing points or wiring: a Dubai-licensed contractor, and the building's approval before work.
- Fire systems (sprinklers, detectors): only the building's fire contractor, through management.
- A deposit dispute or an eviction notice over works: the Rental Disputes Settlement Centre; a lawyer for large sums.
#What the law says
- Law No. 26 of 2007 (landlords and tenants). Art. 16: the landlord maintains the property and repairs defects that affect the tenant's use, unless agreed otherwise. Art. 18: for decoration works that do not affect the structure, the landlord gives the tenant the approvals the authorities ask for. Art. 19: the tenant looks after the property and may not make changes or carry out restoration or maintenance without the landlord's permission and the required licences, apart from repairs agreed or customary for tenants. Art. 20: security deposit, refunded at the end of the lease. Art. 21: return in the original condition except ordinary wear. Art. 23: leasehold improvements stay unless agreed otherwise. Art. 24: sub-letting needs written consent. Art. 19–24 were not changed by Law No. 33 of 2008.
- Law No. 33 of 2008, Art. 25: eviction before the lease ends for sub-letting without written approval, for a change that endangers the property and cannot be undone, or for use against planning and construction rules.
- Unified Ejari tenancy contract, terms 2, 3, 6, 8.
- Dubai Law No. 4 of 2026 on shared housing, as announced by the Dubai Media Office.
- Trakhees Circular No. 2 of 2025: landlord's acceptance for lessees, partitions above 1.8 m.
We checked the documents listed in the sources on 31.10–01.11.2026. Your tenancy contract and your building's rules apply on top.
This guide explains good practice and cites the documents listed below. It is not a permit, a design approval or an engineering opinion. Work on electrical, gas, fire-safety and structural elements must be carried out by licensed professionals and approved by the relevant authority.
Sources
- Law No. (26) of 2007 Regulating the Relationship between Landlords and Tenants in the Emirate of Dubai, Art. 16, 18, 19, 20, 21, 23, 24 — landlord maintenance; landlord provides approvals for decoration works; tenant needs landlord permission and licences for changes, restoration or maintenance; deposit; return in original condition except wear; improvements stay; sub-letting needs written consent
- Law No. (33) of 2008 Amending Law No. (26) of 2007, Art. 25 — eviction for sub-letting without written approval, unsafe changes that cannot be undone, use against planning and construction rules; Art. 19–24 not amended
- Dubai Land Department, Unified Ejari tenancy contract, terms 2, 3, 6, 8 — no modifications without the landlord's written approval, tenant liable for resulting damage; no sub-letting unless legally permitted; follow building rules; landlord does regular maintenance unless agreed otherwise
- wasl help centre, apply for a residential no objection certificate (tenants, read 01.11.2026) — request in the wasl app or website; AED 545 if applicable, not refunded if rejected; refundable deposit for restoring the work; about 7 working days; NOC valid 3 months
- wasl help centre, NOC types and fees (older help-centre page, undated, read 01.11.2026) — approval request for repainting in the same colour with no fee; fee and per-room deposit for a different colour or wallpaper
- DAMAC Living, fit-out NOC flow (help pages, read 31.10.2026) — tenant may submit a fit-out NOC request; the owner approves or rejects it
- Meraas, FAQ, Minor Modifications (read 01.11.2026) — owner, tenant or contractor may apply for a minor modification NOC through RealConnect
- Trakhees (PCFC) Circular No. (2) of 2025, Minor Modification / Decoration works after Completion Certificate — lessee needs the landlord's acceptance; partitions above 1.8 m need approval
- Dubai Media Office, Mohammed bin Rashid issues Law regulating the management and occupancy of shared housing in Dubai, 11.03.2026 — Law No. 4 of 2026; permit needed for shared housing; tenants may not sublease any part of a shared unit; fines AED 500–500,000, doubled for a repeat within a year up to AED 1 million; fire and building standards
- Dubai Media Office, Dubai Municipality issues Planning and Building Requirements Guide for shared housing, 07.10.2026 — Civil Defence fire alarm and firefighting requirements checked before a shared housing permit; minimum 5 m² of bedroom per person
- Emaar Community Management, Home Modifications fact sheet (2022) and contractor permit fact sheet, archived copies — internal painting needs no NOC; every contractor needs an entry permit (ecmpermits.ae); application through the owner's community portal
- Dubai Holding Community Management, Community Rules and Regulations (01.10.2026, v3), §8.2 — same-day access for one-day handyman jobs; Minor Modifications Permit for anything longer
- Dubai Municipality Administrative Resolution No. (109) of 2022 Regulating the Licensing of Maintenance Works, Art. 1–2 — basic maintenance (painting, floors, doors, suspended ceilings, servicing systems) needs no DM permit