Tiles and wall finishes/Global · UAE

Painting walls: preparation, primer, coats and humid climates

The right order for painting walls, which primer, how many coats, drying times, how much paint to buy, and what heat, humidity and AC change in the UAE.

Librae Academy editorialUpdated

A painted wall lasts when the surface underneath is sound, dry and primed, and when there are two full topcoats on it. The usual interior system is one coat of primer, two coats of filler where the wall needs smoothing, and two topcoats. The paint's data sheet tells you how long to wait between coats. A humid climate adds one more rule: keep the wall well above the dew point of the air. In a UAE summer that means windows shut and the AC on while you paint.

#Before you start

Read the data sheet. Every paint has a technical data sheet on the maker's website. It gives the primer to use, the number of coats, the drying time between coats at different temperatures, how far a litre goes, and the conditions the wall and the air must meet. Ask the painter which product they are using and read its sheet. That is your standard for the job.

Check the wall. Paint does not fix what is underneath:

  • Damp or stained ceiling after a leak. Dry it first, replace soft board; see leaks from the flat upstairs.
  • Mould. Clean it, find the cause, then paint; see mould in the bathroom and behind furniture.
  • New cement plaster. It needs to cure. Jazeera's data sheets ask for at least 28 days on new surfaces, surface moisture no higher than 8 % and a surface pH no higher than 9. A painter with a moisture meter can check this in minutes.
  • New plasterboard. Joints taped and filled and dry; see plasterboard types.
  • Old paint flaking. Scrape it back to sound paint. New paint on loose paint comes off with it.

In a full renovation, painting comes after the wet and dusty trades, with the final coat at the very end: see order of works.

#The system, step by step

  1. Protect. Cover floors, take off switch and socket plates (an electrician should make them safe if wires are exposed), mask frames and skirting. Cover the AC return grilles while you sand, so the dust does not end up in the fan coil.
  2. Clean. Wash greasy kitchen walls and anything a hand touches. The data sheets want the surface "sound, clean, dry" and free from dust.
  3. Prime. One coat. On cement plaster, blockwork and gypsum board the primer is an alkali-resistant acrylic emulsion. On a wall that is already painted and sound, prime only the bare and filled patches.
  4. Fill and smooth. Fill cracks and holes, then apply skim filler (often called stucco or putty) in two coats where the wall is uneven. Sand each coat and remove the dust.
  5. Prime the filler if the paint maker's system says so, or at least spot-prime every patch. Unprimed filler drinks the topcoat and shows as dull patches.
  6. First topcoat. Thin it only as the sheet allows: Jotun's emulsions take up to 10 % water.
  7. Wait the full recoat time, then the second topcoat.

The order of steps 3 to 5 varies between makers and products. Jotun's system for its hygiene emulsion is primer, then two coats of filler, then two topcoats. Follow the system on your product's sheet.

Mix the cans. Jotun's data sheet says cans with different batch numbers must be mixed together before use. Otherwise a wall painted from two cans can show two slightly different shades.

#Drying times and coats

Drying time depends on temperature, air movement, coat thickness and the number of coats. Jotun's figures, measured at 50 % humidity, by wall temperature:

ProductNext coat after, 10 °C23 °C40 °C
Emulsion primer6 h3 h1 h
Interior emulsion topcoat (matt)12 h6 h2 h

Two topcoats are the norm in every system above. One coat over primer leaves thin areas and uneven colour, especially with strong colours or over filler.

#How much paint to buy

A data sheet gives a theoretical spreading rate. Jotun's matt emulsion covers 6.6–11 m² per litre per coat, the primer 7–9 m². On rough or porous walls, and once you allow for waste, you get less.

Example: a bedroom 4 × 3.5 m with 2.7 m ceilings has 40.5 m² of wall. Take off a door (0.9 × 2.1 m) and a window (1.5 × 1.5 m) and you have about 36 m². Two coats make about 73 m², so about 7–11 litres of topcoat by the data sheet, before waste. The ceiling is another 14 m² a coat. If you have the flat in Librae, it gives you wall areas with the openings already taken off. The paint quantity follows from those areas, and you can try the colour on the walls in 3D before you buy a single litre.

#Which paint where

  • Walls and ceilings in living rooms and bedrooms: water-based acrylic emulsion, usually matt or a low sheen.
  • Kitchens and hallways: a washable emulsion. "Washable" should mean a scrub test on the data sheet; Jotun's cites EN ISO 11998.
  • Bathroom walls and ceilings outside the shower: an emulsion with a fungal resistance test on the data sheet; Jotun's cites BS 3900 Part G6. It slows mould on a surface that gets damp for a while. It does not stop mould if the room stays wet. Inside the shower, walls are waterproofed and tiled; see bathroom waterproofing.
  • Low VOC. VOCs are the solvents that make new paint smell. A data sheet gives a VOC figure in g/l; Jotun notes it is a theoretical value and a tested one will differ. In Dubai the building code sets the rule (see In the UAE).

#Humidity, heat and AC

Jotun's data sheets ask for a surface at least 10 °C and at least 3 °C above the dew point of the air next to it, and for good ventilation in confined rooms. Jazeera's ask for air humidity no higher than 70 % where you paint. Paint on a surface that is too cold or too damp dries slowly, can stay soft and can blister.

In an air-conditioned flat at 24 °C and 50 % humidity, the dew point is about 13 °C, so walls at room temperature are well clear. The risk comes from outside air. Open the windows in a humid summer to "let the paint dry" and the humidity in the room jumps; surfaces the AC has cooled can then sit near the dew point. Keep doors and windows shut and the AC running during painting and drying, and let the AC move the air; a fan helps in a small room.

#What goes wrong

  • One topcoat to save time. Thin spots and patchy colour.
  • Filler not primed. Dull patches that show in side light.
  • Painting new plaster too early. Blisters, stains and peeling.
  • Painting over mould or a damp ceiling. It comes back through within weeks.
  • Recoating too soon. The data sheet times are minimums, and they get longer in cool or humid air.
  • Windows open in a humid summer. Slow drying and a soft film.
  • Cans from different batches used one after another on the same wall.
  • Thinned too much. Poor hiding, so the painter needs a third coat or skips it.

#How to check the work

  • You know the product and have read its data sheet: primer, coats, recoat time.
  • Bare and filled patches were primed.
  • Two topcoats went on, with the recoat time between them.
  • In daylight and with a torch held flat to the wall, no dull patches, roller lines or visible filler.
  • Edges at the ceiling, frames and skirting are clean.
  • No drips, runs or brush hairs.
  • Switch and socket plates are back and straight.
  • Leftover paint is labelled with the room and colour code, for touch-ups.

For the whole flat, room by room: snag list.

#When to call a professional

  • A painter for anything bigger than a touch-up: a good finish is mostly preparation.
  • FM or the landlord first if the wall is damp, stained from a leak or mouldy. That is not a painting problem.
  • An electrician if removing plates exposes loose wiring.

#In the UAE

  • Permits. Painting is the lightest job. In Emaar communities internal painting needs no NOC, but every contractor needs an entry permit. Other buildings have their own rules: developer NOC in Dubai. If you rent, you need the landlord's written consent: renovating a rented flat.
  • VOC and lead. The Dubai Building Code says paints, coatings, adhesives and sealants used in a building must stay within the VOC limits set by Dubai Central Laboratory and be certified by it or an approved lab. Paints with lead or heavy metals above Dubai Municipality's limits are not allowed. Ask the shop for the certificate of the exact product.
  • Summer. Run the AC and keep the flat closed while you paint, as above.
  • Villa facades use exterior systems with their own data sheets. In Emaar communities external painting needs an NOC, unlike internal painting.

#What the codes say

  • Dubai Building Code 2021: VOC limits for paints, coatings, adhesives and sealants set by Dubai Central Laboratory, materials certified by DCL or an approved laboratory (H.4.10.3; villas K.10.1.6.3); no paints with lead or heavy metals above Dubai Municipality limits, certified by DCL (B.10.6.4).
  • Manufacturer data sheets: Jotun Fenomastic Hygiene Emulsion Matt (2023) and Fenomastic Emulsion Primer (2020); Jazeera Notes Primer JA-11028 (2021) and Royal Semi Gloss JA-17013 (2022). Fungal resistance BS 3900 Part G6, antibacterial ISO 22196, scrub EN ISO 11998, VOC ISO 11890 as cited on the Jotun sheet.

This guide explains good practice and cites the documents listed below. It is not a permit, a design approval or an engineering opinion. Work on electrical, gas, fire-safety and structural elements must be carried out by licensed professionals and approved by the relevant authority.

Sources

  1. Jotun, Fenomastic Hygiene Emulsion Matt, Technical Data Sheet (issue 06.06.2023), pp. 1–3 — Approved for the UAE. System primer 1, filler 2, topcoat 2; 3 °C above dew point; drying and recoat times at 10, 23 and 40 °C; 6.6–11 m²/l; dilution up to 10 %; mixing batches; fungal, antibacterial and scrub tests; theoretical VOC.
  2. Jotun, Fenomastic Emulsion Primer, Technical Data Sheet (issue 01.09.2020), pp. 1–2 — Alkali-resistant primer for cement plaster, concrete, blockwork and gypsum board; defects filled first; 7–9 m²/l; recoat 3 hours at 23 °C.
  3. Jazeera Paints, Jazeera Notes Primer JA-11028, Technical Data Sheet (UAE site, issued 2021), p. 1 — Primer for Jazeera's writable Notes paint. New surfaces cured at least 28 days; old paint removed; surface moisture up to 8 %; workplace humidity up to 70 %; surface pH up to 9; fill before priming; no paint on wet surfaces.
  4. Jazeera Paints, Jazeera Royal Semi Gloss JA-17013, Technical Data Sheet (UAE site, issued 10/2022), p. 2 — The same surface conditions on a standard topcoat sheet (28 days, 8 %, 70 %, pH 9), so they are Jazeera's general rules, not specific to one primer.
  5. Dubai Building Code 2021, Part H, H.4.10.3 (PDF p. 571); Part K, K.10.1.6.3 (p. 818); Part B, B.10.6.4 (p. 144) — Paints within the VOC limits set by Dubai Central Laboratory and certified; no paints with lead or heavy metals above Dubai Municipality limits.
  6. Emaar Community Management, Home Modifications fact sheet (2022), archived copy — Internal painting needs no NOC; external painting does (AED 100 fee); every contractor needs an entry permit, even where no NOC is needed.
  7. US National Weather Service, Wet-bulb temperature and dewpoint from air temperature and relative humidity — Formula for the dew-point example.

Читать по-русски